Google+ COMPUTER TRICKS, TWEAKS AND TUTORIALS

how to create a bootable CD of WIndow XP

 Slipstreaming Windows XP Service Pack 1a and Create Bootable CD

Slipstreaming a Service Pack, is the process to integrate the Service Pack into the installation so that with every new installation the Operating System and Service Pack are installed at the same time.

Slipstreaming is usually done on network shares on corporate systems. But with the advent of CD burners, it does actually make some sense for the home user or small business user to do the same.

Microsoft added the ability to Slipstream a Service Pack to Windows 2000 and Windows XP. It not only has the advantage that when you (re)install your OS, you don't have to apply the Service Pack later, also if you update any Windows component later, you'll be sure that you get the correct installation files if Windows needs any.


Slipstream Windows XP Service Pack 1a:
CODE
http://download.microsoft.com/download/5/4/f/54f8bcf8-bb4d-4613-8ee7-db69d01735ed/xpsp1a_en_x86.exe


Download the (full) "Network Install" of the Service Pack (English version [125 MB]), and save it to a directory (folder) on your hard drive (in my case D:\XP-SP1). Other languages can be downloaded from the Windows XP Web site.

Microsoft recently released Windows XP SP1a. The only difference is that this Service Pack does no longer include Microsoft's dated Java version. If you have already installed Windows XP SP1, there is no reason to install SP1a, but the "older" SP1 (with MS Java) is no longer available for download.

Next copy your Windows XP CD to your hard drive. Just create a folder (I used \XP-CD), and copy all the contents of your Windows XP CD in that folder.

Now create a folder to hold the Service Pack 1a (SP1a) files you are about to extract. I named it \XP-SP1. Next, open a Command Prompt (Start > Run > cmd), and go to the folder where you downloaded SP1a (cd \foldername). Type the command: servicepack filename -x. A small window will appear, and you need to point it to the folder where you want to extract the SP1 files. Click Ok to start extracting the SP1a files.

Once the SP1a files are extracted, change to the update folder of the SP1a files (cd update), and type the following command: update /s:path to WinXP CD files. In my example the command is update /s:D:\XP-CD).

Windows XP Update will do its thing:

When ready, you should get a confirmation. Windows XP Service Pack 1a has now been Slipstreamed into your original Windows XP files.

It is also possible to add the Windows XP Rollup 1 Update. For instructions, please read Adding Windows XP Rollup 1 Hotfix.


Creating a Bootable CD
For this part I used ISO Buster
CODE
http://www.smart-projects.net/isobuster/

and Nero Burning.

Start to extract the boot loader from the original Windows XP CD. Using ISO Buster, select the "folder" Bootable CD, and right-click Microsoft Corporation.img. From the menu choose Extract Microsoft Corporation.img, and extract it to the folder on your hard drive where you have your Windows XP files (D:\XP-CD in my case).

Next, start Nero Burning ROM, and choose CD-ROM (Boot) in the New Compilation window. On the Boot tab, select Image file under Source of boot image data, and browse to the location of the Microsoft Corporation.img file. Also enable Expert Settings, choosing No Emulation, and changing the Number of loaded sectors to 4 (otherwise it won't boot!)


If you have an older version of Nero you won't have the option Do Not Add ";1" ISO file version extention under Relax ISO Restrictions. You won't be able to boot your new CD, so update Nero!
You can configure the Label tab to your liking, I would however recommend that you keep the Volume Label the same as on your original Windows XP CD.

Next press New, and drag & drop the files and folders from your Windows XP hard drive location into Nero.

Next, burn your new CD.

You now have a Bootable, Slipstreamed Windows XP Service Pack 1a CD! 

Famous Seven Mile Bridge In Florida....

The Seven Mile Bridge is a famous bridge in the Florida Keys, in Monroe County, Florida, United States. It connects Knight's Key (part of the city of Marathon, Florida) in the Middle Keys to Little Duck Key in the Lower Keys. Among the longest bridges in existence when it was built, it is one of the many bridges on US 1 in the Keys, where the road is called the Overseas Highway.

 There are two bridges in this location. The older bridge, originally known as the Knights Key-Pigeon Key-Moser Channel-Pacet Channel Bridge, was constructed from 1909-1912 under the direction of Henry Flagler as part of the Florida East Coast Railway's Key West Extension, also known as the Overseas Railroad.


History — After the railroad sustained considerable damage due to effects of the Labor Day Hurricane of 1935, the line was sold to the United States Federal Government, who subsequently refurbished Seven Mile Bridge for automobile use. Dismantled trackage was recycled, painted white, and used as guardrails. It had a swing span that opened to allow passage of boat traffic, near where the bridge crosses Pigeon Key, a small island where a work camp for Flagler's railroad was located. Hurricane Donna in 1960 caused further damage.

The current road bridge was constructed from 1978 to 1982. The vast majority of the original bridge still exists, used as fishing piers and access to Pigeon Key, but the swing span over the Moser Channel of the Intracoastal Waterway has been removed.

Engineering — The new bridge is a box-girder structure built from precast, prestressed concrete sections, comprising 440 spans. Near the center, the bridge rises in an arc to provide 65-foot (20 m)-high clearance for boat passage. The remainder of the bridge is considerably closer to the water surface. The new bridge does not cross Pigeon Key.

The total length of the new bridge is actually 35,862 ft (10,931 m) or 6.79 miles (10.93 km), and is shorter than the original. Each April the bridge is closed for approximately 2.5 hours on a Saturday and a "fun run," known as the Seven Mile Bridge Run, of 1,500 runners is held commemorating the Florida Keys bridge rebuilding project. The event began in 1982 to commemorate the completion of a federally funded bridge building program that replaced spans that oil tycoon Henry Flagler constructed in the early 1900s to serve as a foundation for his Overseas Railroad.

The Seven Mile Bridge was engineered by Figg & Muller Engineers. The structure was completed six months ahead of schedule and has earned eight awards, including an Exceptional Award for Cost Savings Innovation from the Federal Highway Administration.